The customer required mitigation and restoration services for damaged areas in their kitchen and bathroom, necessitating professional containment setup, utility disconnection, and documentation.
Solutions provided:
DaySpring Restoration initiated the project by generating a service agreement and a detailed mitigation scope. An estimate was prepared and sent to the project manager and insurance. The team set up containment barriers in the affected kitchen and bathroom areas, disconnecting floor outlets, including a 220V line, to ensure safety and facilitate work. Throughout the process, progress was meticulously documented with photos and general notes on daily activities.
Photos & Videos:
Severely damaged floor exposing subfloor, with pipes and containment sheeting secured with blue and yellow tape during mitigation.
Kitchen area with blue-taped containment plastic, exposed floor, cabinets, and an air mover on site for restoration.
Bathroom vanity area with mirror, medicine cabinet, light fixture, and containment plastic taped along the walls.
Containment sheeting taped to walls with blue tape in a damaged area, indicating active restoration work.
Bathroom showing initial containment setup with blue tape and plastic sheeting, damaged floor, toilet, and bathtub during restoration.